Back to
album
Original image: The work of the diving station to install piles on boulders and fasten them under water with neighboring piles
Original image: Overgrown and sawed root and baited piles
Image: Driving and filing of piles at a given elevation
Original image: Driving and filing of piles at a given elevation
Image: Expanded front of main pile driving
Original image: Expanded front of main pile driving
Image: Driven and built-up piles
Original image: Driven and built-up piles
Image: Driving piles at the approach of the left bank
Original image: Driving piles at the approach of the left bank
Image: Driving of root piles
Original image: The work of the diving station to install piles on boulders and fasten them under water with neighboring piles
Original image: Overgrown and sawed root and baited piles
Image: Driving and filing of piles at a given elevation
Original image: Driving and filing of piles at a given elevation
Image: Expanded front of main pile driving
Original image: Expanded front of main pile driving
Image: Driven and built-up piles
Original image: Driven and built-up piles
Image: Driving piles at the approach of the left bank
Original image: Driving piles at the approach of the left bank
Image: Driving of root piles
Original image: Expanded front of main pile driving

Original image: Expanded front of main pile driving

Original image: Expanded front of main pile driving

0 comment
Author
Unknown
Source
The central archive of the Ministry of Defence

2026 © Russian Military Historical Society Developed by Jetmix