Original image: Erection of subgrade for military field railways
Original image: Section of the route of the military field railway
Image: Tying a rope to extract an aerial bomb, weighing 1400 kg. The work is carried out by a Red Army soldier of the Motorized Infantry Platoon (MPV), the 87th Restoration Railway Battalion of Comrade Bessarab. The pit is 6.0 m deep. The volume of excavation is 24 m³. The excavation took 18 hours a day
Original image: Tying a rope to extract an aerial bomb, weighing 1400 kg. The work is carried out by a Red Army soldier of the Motorized Infantry Platoon (MPV), the 87th Restoration Railway Battalion of Comrade Bessarab. The pit is 6.0 m deep. The volume of excavation is 24 m³. The excavation took 18 hours a day
Image: National Liberation Party-4 Senior Lieutenant Brizgalov
Original image: National Liberation Party-4 Senior Lieutenant Brizgalov
Image: Bridge in the period of recovery and strengthening
Original image: Bridge in the period of recovery and strengthening
Image: Restoration of the Bryansk node
Original image: Restoration of the Bryansk node
Image: Restored water supply
Original image: National Liberation Party-4 Senior Lieutenant Brizgalov

Original image: National Liberation Party-4 Senior Lieutenant Brizgalov


0 comment

2026 © Russian Military Historical Society Developed by Jetmix