Image: Suspension of wires of the communication line of the military field railway (VPZhD)
Original image: Suspension of wires of the communication line of the military field railway (VPZhD)
Image: Excavation device of the Military Field Railway
Original image: Excavation device of the Military Field Railway
Image: Prepared sleepers for military field railways
Original image: Prepared sleepers for military field railways
Image: Erection of subgrade for military field railways
Original image: Erection of subgrade for military field railways
Image: Section of the route of the military field railway
Original image: Section of the route of the military field railway
Image: Tying a rope to extract an aerial bomb, weighing 1400 kg. The work is carried out by a Red Army soldier of the Motorized Infantry Platoon (MPV), the 87th Restoration Railway Battalion of Comrade Bessarab. The pit is 6.0 m deep. The volume of excavation is 24 m³. The excavation took 18 hours a day
Original image: Prepared sleepers for military field railways

Original image: Prepared sleepers for military field railways


0 comment

2026 © Russian Military Historical Society Developed by Jetmix