Back to
album
Image: Laying of nozzles and installation of struts on the left-hand side section of the bridge
Image: Nozzles laid on piles
Image: Nozzles laid in the high-rise part of the bridge
Image: Laying attachments from the scaffold
Image: The work of the diving station to install piles on boulders and fasten them under water with neighboring piles
Image: Driving and filing of piles at a given elevation
Image: Expanded front of main pile driving
Image: Driven and built-up piles
Image: Driving piles at the approach of the left bank
Image: Driving of root piles
Image: First driven piles
Image: Laying of nozzles and installation of struts on the left-hand side section of the bridge
Image: Nozzles laid on piles
Image: Nozzles laid in the high-rise part of the bridge
Image: Laying attachments from the scaffold
Image: The work of the diving station to install piles on boulders and fasten them under water with neighboring piles
Image: Driving and filing of piles at a given elevation
Image: Expanded front of main pile driving
Image: Driven and built-up piles
Image: Driving piles at the approach of the left bank
Image: Driving of root piles
Image: First driven piles
Image: Driving and filing of piles at a given elevation

Image: Driving and filing of piles at a given elevation

Image: Driving and filing of piles at a given elevation

0 comment
Author
Unknown
Source
The central archive of the Ministry of Defence

2026 © Russian Military Historical Society Developed by Jetmix