Back to
album
Image: Preparation on the construction site of the superstructure for sliding
Image: Cross slide from the pontoon bridge of the swing span trusses on the Neva River
Image: Sliding and assembly of a movable superstructure on the Novoladozhsky canal
Image: Installing wooden clamps on bags
Image: Assembly of metal bags from Lockovan sheet piling
Image: Pontoon feed from Lockovan sheet pile
Image: Mechanical drilling of holes and pre-assembly of packages from Lockovan sheet piling
Image: Installation of handrails
Image: Laying of wooden purlins on the left bank overpass
Image: Layout on the supports of the axles of the superstructures
Image: Laying attachments and Mauerlat beams
Image: Preparation on the construction site of the superstructure for sliding
Image: Cross slide from the pontoon bridge of the swing span trusses on the Neva River
Image: Sliding and assembly of a movable superstructure on the Novoladozhsky canal
Image: Installing wooden clamps on bags
Image: Assembly of metal bags from Lockovan sheet piling
Image: Pontoon feed from Lockovan sheet pile
Image: Mechanical drilling of holes and pre-assembly of packages from Lockovan sheet piling
Image: Installation of handrails
Image: Laying of wooden purlins on the left bank overpass
Image: Layout on the supports of the axles of the superstructures
Image: Laying attachments and Mauerlat beams
Image: Pontoon feed from Lockovan sheet pile

Image: Pontoon feed from Lockovan sheet pile

Image: Pontoon feed from Lockovan sheet pile

0 comment
Author
Unknown
Source
The central archive of the Ministry of Defence

2026 © Russian Military Historical Society Developed by Jetmix